imgboxbg

BUSINESS

Agricultural industrialization

Current:
Homepage
/
Thermo Electron

Thermo Electron

  • Categories:产业领域
  • Time of issue:2020-11-18 14:03:56
  • Views:0
Description:
Description:
Information

Yufeng industrial group Thermal Power Co., Ltd. was established in 2003. The units in the three parks are energy saving and emission reduction promotion (energy efficiency power plant) projects in Hebei Province loaned by ADB, which were put into operation in February 2014 and August 2019 respectively.


In the first phase, a loan of US $17 million from ADB is used. At present, a 220t / h high temperature and high pressure pulverized coal boiler is equipped with a 35mW back pressure steam turbine generator unit. The annual power generation is 197.8 million kwh, the heat supply is 3.84 million Jijiao, and the annual standard coal saving is 27000 tons.


In the second phase, a loan of 180 million yuan from ADB is used. At present, a 480 / h Subcritical pulverized coal boiler is equipped with a 100 MW subcritical back pressure steam turbine generator unit. The annual power generation is 480 million kwh, and the heat supply is 6.604 million GJ. It can save 32000 tons of standard coal annually. It is also the first 100 MW back pressure unit with subcritical pressure and supercritical temperature in China.

The desulfurization tower is made of 1.4529 alloy steel, which is wear-resistant and corrosion-resistant. The investment is nearly 100 million yuan. The flue gas treatment fully meets the deep treatment index of coal-fired power plant.


The main supply group production, Yufeng residential electricity, Ningjin County, part of the city supply heat.

There is currently no content to display
Please add data record on website background.

在线搜索

搜索
Search

Strive to provide customers with perfect products and services.

 玉锋集团

玉锋集团